STORM PRO

This is the building process of a GS-Racing STORM PRO with all pro's and con's found.

!Click on the pictures to enlarge!

STEP 17

Take for STEP 17 the linkage we made in STEP 13. Use a plyer to press them on the balls. Make sure that the marking of the left/right thread for the RIGHT side upper linkage is on the outside (see red mark). 
Fit the both axles in the dif output.
Connect the outside of the upper linkage to the hub carrier and use the inner top hole by sliding a 3x25 screw through it. Also watch the mark in the left/right thread (marked green) for this LEFT side of the car.
Secure the other side with a 3 m/m lock nut. Do the same for the RIGHT side of the car.
The rear gear box ready too.

INDEX

© All rights reserved by