This is the building process of a GS-Racing STORM PRO with all pro's and con's found.
 |
We need to open the bag with STEP 22-31 |
 |
This is the contents of the bag with STEP 22-31 |
 |
The drawing off all parts in bag for STEP
22-31 |
 |
Take these parts. |
 |
Fit the front chassis stiffener with a 3x12 m/m counter sunk screw and a
3 m/m counter sunk washer. Use thread lock. |
 |
Fit a 3x12 m/m counter sunk screw in the red marked hole at the bottom
of the chassis. Use thread lock. |
 |
Fit the rear chassis stiffener with a 3x20 m/m round head screw to the
rear gear box. |
 |
Secure the screw with a 3 m/m lock nut. |
 |
Fit a 3x12 m/m counter sunk screw in the red marked hole at the bottom
of the chassis. Use thread lock. |