This is the building process of a GS-Racing STORM PRO with all pro's and con's found.
 |
We now open the second bag marked STEP 4-8. |
 |
These are all the bags inside this large bag for STEP
4-8. |
 |
The drawing off all parts in bag for STEP
4-8 |
 |
We take all parts shown here to assemble to the front gear box. |
 |
First fit the 3x23 m/m hexagon screws and the shock-bushings.
Use some thread lock to secure them. I used the holes mentioned in the
manual and showed in the picture. |
 |
Now fit the front body post with a countersunk self tapping 3x12 m/m
screw with a M3 countersunk washer. |
 |
Take four 3x12 m/m countersunk self tapping screws with M3 countersunk
washers and fit the shock tower as showed in the picture. |
 |
Now fit the upper hinge pin holder with two self tapping counter sunk
3.5x16 m/m screws. |
 |
Mount the bumper with a self tapping round head 3x12 m/m screw. |
 |
So we have a finished front gear box. |