This is the building process of a Hong
Nor
X1-CRwith all pro's and con's found.
Click on the pictures to enlarge
Step 7
The grey hard coated T6-7075 milled aluminum
front shock stay.
Fit in the center top hole a 3 x 25 mm
hexagon screw and turn a shock ball on the screw by hand force.
Align the hexagon of the shock ball with the the milled out hexagon of the
shock stay and secure the 3 x 25 mm hexagon screw using a 2.5 mm hexagon
tool.
Do not use thread lock!
Fit the front shock stay to the front gear
box.
Use 4x 10 mm round head hexagon screws using a 2.5 mm hexagon tool at the
red marked spots.
At the green marked spots use 3 x 10 mm round head hexagon screws using a
2 mm hexagon tool.